Friday, April 26, 2024

ADG aids in planning and development of OKANA Resort & Indoor Waterpark

A $300 million resort, including a waterpark, retail, dining and hotel, is set to be built by the Chickasaw Nation along the Oklahoma River in southeast Oklahoma City. The development, which features a First American’s museum and cultural center, opened last month and construction on the hotel/indoor waterpark is set to start in summer 2022 with an opening in 2024. The OKANA Resort & Indoor Waterpark is being designed by Wisconsin-based ADCI and developed by New York-based Aquatic Development Group (ADG).

ADG was brought on board to not only to design both the indoor waterpark and the outdoor adventure lagoon and activity pools, but to contribute throughout the master planning and design process for the entire resort, providing valuable insight based on years of similar experience.

Photo courtesy of Aquatic Development Group.

The 400+ room hotel will be built around a 107,000-square-foot two-story indoor waterpark that will feature a wave pool, action rivers, multiple pools and slides, and will be surrounded by a five-acre outdoor adventure lagoon that will be built at the center of the property and will include one main body of water and two smaller bodies of water, all lined with sandy beaches.

The resort also will feature a 33,000-square-foot family entertainment center, a 39,000-square-foot conference center with two ballrooms, a spa, a golf simulator, and a retail center featuring boutique shops and restaurants.

Related Articles

Latest Articles